All the lights on the first floor are in with the exception of the 1/2 bath and I expect the the second floor and the basement will be finished today. They also started staining the handrails and I'm really liking the color. I tried to match it to the hardwood floors as much as possible.
We have the light package in the kitchen and I still can't nail down which switch works which light. There is a switch for the light over the sink, another for "kitchen" and yet another switch for the light over the end of the island.
ReplyDelete